PROJECT PHOTO RECORD · INDAPUR
APYS Projects carried out the complete electrical work and network rack dressing for Group Surya in Indapur. This project record brings together original site photographs of the electrical installation, UPS and battery banks, cabinet layout, front patching and rear cable routing.

Project at a glance
Client / site: Group Surya
Location: Indapur
Work: Complete electrical work, network rack dressing and cable organisation
Photography: Actual site photographs supplied by APYS Projects.
Rack organisation and patching
The front view shows patch panels and horizontal cable managers arranged through the cabinet, with yellow patch cords routed toward the sides. The rear views show grouped grey cable routes approaching the panel positions, alongside the yellow cable runs.
Rear rack overview

Cable routes into the patch panels

Side cable management

Vertical cable organisation

These photographs document the physical rack arrangement during site work. Cable certification and operational test results are separate from this photo record.
Electrical work by APYS Projects
APYS Projects carried out the complete electrical work for Group Surya at Indapur. The original site photographs below document the electrical panels, distribution boards, cable routes, UPS units and battery banks at the site.




These photographs record the installation and room layout. Equipment ratings, battery autonomy, commissioning measurements and certification results are not specified in this photo record.
How to use this project record
| Area | What the photographs document | What to verify separately |
|---|---|---|
| Network rack | Patch-panel arrangement, patch cords and cable routes | Port schedule, link certification and active-network operation |
| Electrical distribution | Panels, distribution boards and visible room layout | Approved drawings, protection settings and electrical test records |
| UPS and batteries | Physical placement of UPS units and battery banks | Equipment ratings, supported load and measured autonomy |
For a similar project, start with an equipment register, marked drawings, a port schedule and agreed acceptance checks. Compare the physical arrangement with the test and handover records before accepting the complete installation. These are planning steps for your project; they are not additional test results for Group Surya.
Our rack-dressing guide explains layout and maintenance decisions. Use the network handover checklist to plan documentation with your contractor.
Discuss your electrical and networking project
Share your site location, drawings, electrical requirements, equipment list and current photographs. APYS Projects can discuss the electrical installation, distribution, UPS and network rack requirements for your agreed project scope.
Request an electrical or networking quotation → · Networking & structured cabling services · Fluke cable testing